Projects 2012-13

Projects 2012-13

List of works for the year 2012-13 undertaken by WBGEDCL:

  • Installation of 10 nos. of Solar Home Lighting systems.
  • Distribution of 1875 Nos. of Solar Lantern to the DM, South 24 Parganas for distribution the same to the Minority Students. (Pahse-II).( Gosaba, Namkhana, patharpratima, Sagar)
  • Installation of 3 kW off-grid Power Plant at Mangrove Tourist Lodge. (Henry Island)
  • Installation of 7 kW Rooftop Grid connected Power Plant at Bethun College.